WE MOVED TO http://www.XPrizeNews.org
ANSARI X PRIZE Space Race News!
Latest News | Official ANSARI X PRIZE WebSite | Teams List | Community | F.A.Q.
We have moved to http://www.XPrizeNews.org.
Tuesday, May 20, 2003
Scaled Composites news: First captive carry flight with mated White Knight and SpaceShipOne
Objectives: First captive carry flight with mated White Knight and SpaceShipOne. Vibration and aerodynamic interface assessment. Mated handling qualities evaluation. Envelope expansion to 130 knots / Mach 0.5 above 45,000 feet. Stalls and 2/3-rudder sideslips. SpaceShipOne systems inactive, controls locked and cabin unmanned. Launch system was qualified and functional for this flight.
Results: Excellent two-ship stability & control throughout the envelope. No interference or vibration issues. Smooth surface flows on SS1 except around rocket nozzle. Two-ship performance was as predicted. Mach .53 was achieved at 48,000 ft. Climb rate at 48,000 ft was 700 ft/min. Envelope was cleared for future manned captive carry and glide flights.
Next flight should be a manned captive carry in which all SpaceShipOne systems (except rocket propulsion) will be tested at altitudes up to 50,000 ft. If successful, the glide flights will follow soon, since the systems preparation and pilot training requirements are the same. Read More
Archives: Latest News |
April 2003 |
May 2003 |
June 2003 |
July 2003 |
August 2003 |
September 2003 |
October 2003 |
November 2003 |
December 2003 |
January 2004 |
February 2004 |
March 2004 |
April 2004 |
May 2004 |
June 2004 |
July 2004 |
Site
Feed
0 Comments:
Post a Comment