WE MOVED TO http://www.XPrizeNews.org
ANSARI X PRIZE Space Race News!
Latest News | Official ANSARI X PRIZE WebSite | Teams List | Community | F.A.Q.
We have moved to http://www.XPrizeNews.org.
Sunday, August 24, 2003
Armadillo Aerospace News: Plumbing complete, suit pressurization
All engine plumbing and wiring is complete on the big vehicle. We loaded water into the big tank and tested all the valves, with pretty good results. Our distribution manifold has a leak in the weld which will need to be fixed, and the fill port 2” threads were loosened during the filling process when the giant hose pressurized itself and whipped around a bit. We can’t just weld the inlet fittings, because the check valve is stainless steel, while the rest of the hardware is aluminum, so we may need to weld flanges onto each side and bolt them together.
If there was catalyst in the engines, the big vehicle is now capable of flight, but we still need to get the drogue cannon worked out before it can land properly. We also need to make some honeycomb panels to protect the base of the tank from exhaust at launch, but we are running out of things to do on it. The base will need a fair amount of rework when we put the full size engines on it, but the basic layout will probably remain the same. Read More
Archives: Latest News |
April 2003 |
May 2003 |
June 2003 |
July 2003 |
August 2003 |
September 2003 |
October 2003 |
November 2003 |
December 2003 |
January 2004 |
February 2004 |
March 2004 |
April 2004 |
May 2004 |
June 2004 |
July 2004 |
Site
Feed
0 Comments:
Post a Comment